Navigation

  • Skip to Content
This website uses cookies, our own and those of third parties, to provide the best possible experience. By continuing to use our website you consent to the use of these cookies. For more information, please Click Here
Putzmeister
SANY Logo

Join the conversation

PGSRegions-web Portlet

  • INTERNATIONAL
  • EUROPE
  • AMERICAS
  • ASIA PACIFIC
  • AFRICA & MIDDLE EAST
  • RUSSIA & CIS
  • INDIAN SUBCONTINENT
  • English

Navigation

Toggle navigation
  • Updates
    image
    Updates

    Your window to the latest happenings at Putzmeister

    • Putzmeister in the News
      image
      Putzmeister in the News

      The latest news from Putzmeister

      • Asset Publisher

        Interview with Martin Knoetgen, CEO and Managing Director of Putzmeister....READ MORE

    • Press Releases
      image
      Press Releases

      Heads up on what's happening at Putzmeister

      • Asset Publisher

        Starting October 2019, Putzmeister and Sany are combining forces to bring you enhanced Concrete Solutio...READ MORE

    • PM Post
      image
      PM Post

      Keeping you in the know

      • Asset Publisher

        Customers from India and Nepal about their experience of working with Putzmeister Concrete Solutions...READ MORE

    • Events
      image
      Events

      Bringing Putzmeister to you

      • Asset Publisher

        Visit us at Stall No. OD 4, Orange Lot, Outdoor, Bangalore International Exhibition Centre, Bengaluru, ...READ MORE

    • Archives
      image
      Archives

      The Putzmeister Encyclopedia

  • Success Stories
  • Products
    image
    Products

    Our extensive range of equipment

    • Concrete
      Concrete

      Solutions to all your concrete needs

      • BATCHING PLANTS
      • CONCRETE PUMPS
        • TRUCK-MOUNTED PUMPS
        • STATIONARY PUMPS
        • CRAWLER
        • PRE-CAST
      • TRANSIT MIXERS
      • PLACING BOOM
      • PLACING SYSTEMS
      • BUFFER STORAGE
      • TECHNOLOGY
      • USED MACHINES
    • Shotcrete
      Shotcrete

      Power & accuracy to deliver results

      • MECHANISED
      • MANUAL
      • WET-MIX
      • TECHNOLOGY
      • USED MACHINES
    • Telebelts®
      Telebelts®

      Versatile equipment for quick results

      • PRODUCT RANGE
      • TECHNOLOGY
      • USED MACHINES
    • Mortar
      Mortar

      Reliable. Productive. User-friendly

      • SEMI-DRY SCREED CONVEYORS
      • PUMPS FOR SELF-LEVELLING COMPOUND
      • SELF LEVELLING SCREED PUMPS
      • PLASTERING MACHINES
      • PUMPS FOR CONCRETE REPAIR
      • PUMPS FOR GEOTHERMAL DRILLING
      • PUMPS FOR FIRE PROTECTION
      • PUMPS FOR GLASS FIBRE REINFORCED CONCRETE
      • PUMPS FOR INJECTING/GROUTING/FILLING
      • PUMPS FOR MASONRY MORTAR
      • ETICS COMPOSITE BINDER
      • SAND, GRAVEL AND AGGREGATE
      • MORTAR TECHNOLOGY
      • USED MACHINES
    • Tunneling
      Tunneling

      Safety. Quality. High Performance

    • Mining
      Mining

      Master the underground

    • Energy
      Energy

      Prioritising energy conservation

    • Environment
      Environment

      Reliable, eco-friendly systems

  • Support
    image
    Support

    We have your back… Always!

    • Service
      image
      Service

      Helping your operations run smoothly

      • Warranty
    • Training
      image
      Training

      Make the best use of your machines

  • Spare Parts
  • About Us
    image
    About Us

    Get to know us a little better

    • Putzmeister at a glance
      image
      Putzmeister at a glance

      What Putzmeister’s all about!

    • Technology
      image
      Technology

      A peek at our renowned services

    • Global Leadership & Team
      image
      GLOBAL LEADERSHIP & TEAM

      Meet our skilled team

    • Our History
      image
      Our History

      Putzmeister: how it all began to now

    • CSR
      image
      CSR

      We conscientiously, consistently give back to society

  • Contact Us
  • Careers
  • Search
  • Search

    Search

    search

Success Story Details - INDIA

Asset Publisher

  • PANAMA CANAL, CENTRAL AMERICA

    The historic Panama Canal Third Set of Locks project

Going Global for the Panama Canal

Putzmeister’s Special Applications Business group provides a complete global systems approach for The Panama Canal Third Set of Locks project

March 22, 2011 | Americas | Success Story
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn

Putzmeister America, Inc. and its Special Applications Business (SAB) group are providing their complete global systems approach, including their pumping and material placing equipment, to the historic Panama Canal Third Set of Locks project (Third Set of Locks). The Third Set of Locks create a new third lane of traffic along the Canal, doubling its capacity and allowing more traffic and longer, wider ships to pass through.

The Canal’s History
It was first determined in the 1930s that the most effective and efficient way to increase the Canal’s capacity was to construct a third set of locks with larger dimensions than those of the locks built in 1914. The United States initiated the construction of the Third Set of Locks in 1939 to allow the transit of commercial and war ships that exceeded the size of the existing locks. The expansion was halted in 1942 because of the outbreak of World War II.

Interest picked back up again and studies in recent years by the Panama Canal Authority (ACP), the owner/developer of the project, pointed to the same solution as was deemed in the 1930s, that a larger, third set of locks would be the most suitable, profitable and environmentally responsible way to increase Canal capacity and allow the Panamanian maritime route to continue to grow.

The Third Set of Locks
There are four objectives the ACP put forth for this project, and they include: making long-term growing and sustainable contributions to the Panamanian society through the payments the Canal makes to the National Treasury; maintaining the Canal’s competitiveness as well as the value of the Panama maritime route to the national economy; increasing the Canal’s capacity in order to capture the growing demand with the appropriate level of service for each market segment; and increasing the Canal’s productivity, safety and efficiency.

There were three main components of the project. 
-Construction of two 1,400-foot (427m) long by 180-foot (55m) wide by 60-foot (18m) deep lock facilities. One will be in the Atlantic side and one will be in the Pacific side of the Canal. Each of the locks will have three chambers, and each chamber will have three water re-utilization basins. The basins will allow the third set of locks to re-utilize 60 percent of water in each transit and use seven percent less water per transit than each of the existing lock lanes. 
-Construction of access channels for the new locks and widening existing channels.
-Deepening of existing navigation channels and the elevation of Gatun Lake’s maximum operating level.

The design-build contract for the project was awarded to Consortium Grupo Unidos por el Canal (GUPC), which is made up of four companies: Sacyr Vallehermoso S.A., Impregilo S.p.A., Jan De Nul n.v. and Constructora Urbana, S.A.

Construction started in late 2007 and the target date for completion is August 2014 - 100 years after the initial locks on the Canal were opened.

Global Resources
Bob Weiglein, Telebelt® division manager for Putzmeister America, traveled to Milano, Italy, where he was introduced to Mr. Alberto Buffa of Impregilo S.p.A. (Impregilo) by the president of Putzmeister Italy, Dr. Rober Abel, to discuss what material placing solutions Putzmeister’s SAB unit could offer for the Third Set of Locks.

“SAB is a partnership between Putzmeister America, Inc., Allentown Shotcrete Technology, Inc., Esser Pipe Technology and Maxon Industries, Incorporated,” says Weiglein. “This partnership offers a complete systems approach that offers all products to all projects around the world, to customers in tunneling and mining, dams and power generation, transportation, and marine and offshore industries.”

In the meeting it was expressed that flexible, maneuverable and mobile material placing systems were key because of the job site’s unstable terrain.

“Just as the original Canal faced land slides and flooding,” explains Weiglein. “Todays work sites have areas of flooding and unstable banks as well as solid rock.”

After the meeting in Italy, SAB and Agreconsa, Putzmeister’s local dealer for 24/7 parts, service and support in Panama, worked together to determine what system solutions would be ideal for various components of the project.

“Agreconsa is a well-respected distributor in Panama and takes great pride in the sale and service of Putzmeister equipment,” says Weiglein. “They are committed to Panama, it’s economy, and work together with us to provide exactly what customers need.”

There first was a need to place concrete and gravel for the project’s batching and crushing plant’s foundation.

SAB and Agreconsa proposed using six Telebelt® TB 130 telescopic belt conveyors for that portion of the project. GUPC accepted the proposal.

“The reason the Telebelts were the ideal equipment choice for this portion of the job was because they do not need to be permanently mounted to the ground or a super-structure,“ Weiglein comments. “In the event the equipment had to move due to changing terrain conditions the TB 130’s quick setup and tear down provides that flexibility and mobility that GUPC expressed was a necessity on the job site.”

“Another benefit of the Telebelt is that multiple types of material can be placed with one piece of equipment, and in the same day,” explains Peter Mamopulakos, owner of Agreconsa. “Since both concrete and gravel are being placed on the site this feature is an invaluable asset. The TBs are true multi-taskers.”

The Telebelts arrived on site in August 2010.

Don Matthews, Putzmeister’s field service technician for Telebelts, went out for the first two weeks the Telebelts were on site to help start up the equipment, train the local operators, and ensure the customer had everything they needed.

“We always send one of our field service technicians out on new start ups to ensure there is nothing in question for the customer and they feel comfortable operating their new piece of equipment,” says Weiglein. “For this project, Don is on site once every quarter to check in with the customer.”

“To-date we’ve placed about 26,160 cubic yards (20,001m³) of concrete for this portion of the project, and the smooth, surge-free conveying of the material has helped to keep the project on schedule,” notes Weiglein.

A Look Ahead
The Telebelts were instrumental in placing concrete for the water re-utilization basins. For this portion of the project, the Telebelts were expected to convey approximately 654,000 cubic yards (500,019m³) of concrete.

In addition to the Telebelts, SAB and Agreconsa delivered a considerable amount of equipment, ranging from Thom-Katt® trailer pumps to boom pumps for other portions of the project.

The expansion was officially opened in June of 2016.

 

Six Putzmeister Telebelt® TB 130 telescopic belt coneyors place concrete and gravel for the Panama Third Set of Locks’ batching and crushing plant’s foundation.

Six Putzmeister Telebelt® TB 130 telescopic belt coneyors place concrete and gravel for the Panama Third Set of Locks’ batching and crushing plant’s foundation.

The Telebelt 130 offers a 126-foot, six-inch (38.56m) horizontal reach with its five-section boom arm.

The Telebelt 130 offers a 126-foot, six-inch (38.56m) horizontal reach with its five-section boom arm.

A total of 5,885,777 cubic yards (4,500,000m³) of concrete is needed for the entire Third Set of Locks project.

A total of 5,885,777 cubic yards (4,500,000m³) of concrete is needed for the entire Third Set of Locks project.

One new lock facility will be located on the Pacific side of the Canal, to the Southwest of Miraflores Locks. The other new lock facility will be located to the East of Gatun Locks.

One new lock facility will be located on the Pacific side of the Canal, to the Southwest of Miraflores Locks. The other new lock facility will be located to the East of Gatun Locks.

Used equipment

TK 40 Tier 4I

Telebelt® TB 130

Telebelt® TB 200

view all products

58Z

53z

view all products

Owner/Developer: Panama Canal Authority (ACP) - Panama City, Panama
Program Manager: CH2M Hill, Englewood, Colorado (world headquarters)
Design-Build Contractor:  Grupo Unidos por el Canal joint venture – Milano, Italy
Equipment: Six Putzmeister Telebelt® TB 130 telescopic belt conveyors.

  • World’s Largest Concrete Boom Pump Reaches Success on Historic Project
  • The Grand Pour
  • Goldman Sachs Tower, Jersey City, USA
  • Stadium, Gwinnett county, Georgia, USA
  • Modern Art Museum, Fort Worth, USA
  • Lambeau Field, Wisconsin, USA
  • Hoover Dam bypass, USA
  • 9/11 monument, New York, USA
  • Tacoma Narrows Bridge, Seattle, Washington, USA
  • An Amazonian City

VIEW ARCHIVES

Footer

Putzmeister Logo

Putzmeister Concrete Machines Pvt. Ltd.
Plot N-IV, Phase 4, Verna Industrial Estate
Salcette - Goa
India 
Tel.: +91-832-6696-000
Fax: +91-832-6696-300

INSITE

PARTNERNET

CRM

  • INSITE
  • PARTNERNET
  • CRM

Products

  • Concrete
  • Shotcrete
  • Telebelts®
  • Mortar
  • Tunneling
  • Mining
  • Energy
  • Environment

UPDATES

  • Putzmeister in the news
  • Press Releases
  • PM Post
  • Events

Success Stories

  • Polavaram Dam, India
  • Motor Racing Track, India
  • Bengaluru Metro, India
  • High-rise Luxury Apartments, India
  • The World's Largest Oil Refinery, India
  • Thermal Power Plant, India

Spare Parts


SUPPORT

  • Service
  • Warranty
  • Training

ABOUT US

  • Our History
  • Putzmeister at a glance
  • Global Leadership & Team
  • Technology
  • CSR

CAREERS


Used Machines


CONTACT US


Imprint


Privacy Policy

Legal


Sitemap
Privacy Policy