CP 2110 HP
Handles a Range of Applications, Including High-Rise Jobs
The CP 2110 HP features the same large capacity hopper, Ergonic® Pump
Control System (EPS),and powerful S-valve as other Putzmeister City Pumps.
With a maximum output of 106 m³/h, the optional SBU rod/piston
conversion system lets you switch from the rod side to the piston side
quickly and easily. Capable of pumping pressures up to 220 bar on the
piston side, the CP 2110 HP concrete pump can handle arrange of
applications including high-rise jobs.