CP 2110 HP
Handles a Range of Applications, Including High-Rise Jobs
The CP 2110 HP features the same large capacity hopper, Ergonic® Pump
Control System(EPS),and powerful S-valve as other Putzmeister City Pumps.
With a maximum output of 139 yd³/hr (106 m³/hr), the optional SBU
rod/piston conversion system lets you switch from the rod side to the
piston side quickly and easily. Capable of pumping pressures up to
3,191 psi (220 bar) on the piston side, the CP 2110 HP concrete pump
can handle arrange of applications including high-rise jobs.